ImplementationTemplate

Implementation Roadmap Template

The phased delivery framework we use for AI implementation projects. Use this to understand how we structure production builds.

← All resources

Last updated: 2026-04-07

01

Phase 1: Foundation

Set up the environment, establish data access, and prove the integration works end-to-end.

  • Development environment setup
  • CI/CD pipeline configuration
  • Data source access confirmed
  • Core data pipeline (ingestion → processing → output)
  • Integration tests passing
  • Milestone: data flowing end-to-end
02

Phase 2: Core Build

Implement the AI logic, test accuracy, and iterate on quality until benchmarks are met.

  • AI technique implementation (model / prompt / pipeline)
  • Accuracy testing against sample data
  • Quality benchmarks established
  • Iteration based on test results
  • Edge case identification and handling
  • Milestone: AI accuracy meets agreed threshold
03

Phase 3: Production Hardening

Add the reliability layer that makes the difference between a demo and a production system.

  • Error handling and retry logic
  • Fallback mechanisms for graceful degradation
  • Input validation and output verification
  • Monitoring and alerting setup
  • Logging for debugging and audit trail
  • Performance testing under load
  • Milestone: system handles failures gracefully
04

Phase 4: Deployment & UAT

Client review in staging, production deployment, and close monitoring during the critical first days.

  • Staging deployment for client review
  • Client UAT walkthrough
  • Feedback collection and fixes
  • Production deployment
  • 72-hour close monitoring period
  • Milestone: system stable in production
05

Phase 5: Handover

Knowledge transfer, documentation, and support transition so the client team can operate independently.

  • System documentation (architecture, data flow, configuration)
  • Operational runbook (troubleshooting, restart, scale, update)
  • Recorded handover session with client team
  • Support period agreement (typically 2–4 weeks)
  • Milestone: client team operating independently
06

Dependencies & Risk Register

Track what needs to happen when, and what could go wrong.

  • Phase dependencies (what blocks what)
  • External dependencies (client data access, approvals, infrastructure)
  • Technical risks with mitigation strategies
  • Timeline risks and contingency plans
  • Resource requirements per phase
  • Communication schedule